Facility and Utility Systems - Analysis/Design/Construction
Portfolio Image

Project Description

A Mid-Atlantic candy manufacturer, relying heavily on hot water generation for building heat and process requirements, turned to ThermalTech Engineering for engineering and construction management for the replacement their failing hot water boilers. During design, ThermalTech identified inefficiencies in the system that resulted in increased pumping horsepower and decreased boiler effectiveness. We were able to develop a creative solution which greatly reduced boiler cycling, increased capacity, and allowed for better control. Additionally, our engineers provided Construction Management services to ensure that the project was completed successfully during a short two-week window at the height of heating season.

Project Details

  • ClientConfidential
  • LocationMid-Atlantic Region
  • IndustryConfectionery Manufacturing
  • Scope of ServiceEngineering